Roof edges, eaves and gutters
Roof-edge access requires eaves height and the proposed parking position. For a point behind a parapet or further onto the roof, mark its setback from the edge and any obstacles.
For work beside a service building in Quyi Chirchiq District, show the ground edges and any surface changes after rain. Give the height to the actual work point and the vehicle’s setback from the wall separately.
45 mQuyi Chirchiq District is part of Tashkent Region. For a site around Do‘stobod, include the mahalla and exact vehicle entrance as well as the settlement name so that equipment access can be discussed.

Roof-edge access requires eaves height and the proposed parking position. For a point behind a parapet or further onto the roof, mark its setback from the edge and any obstacles.
For luminaire replacement or architectural-lighting access, state the point count, each height and distances between them. These details help discuss equipment moves and access to the supports.
For cable routes, ventilation or other facade-mounted services, state the working length. Show crossings with canopies, pipes or wires where they may affect boom movement.
Send the address, work height and photos of the facade, access route and lift parking space.
Message on TelegramThat depends on height, edge setback, parapet and vehicle position. A working height of up to 45 m does not imply the same horizontal reach.
Mark them on a plan or photo sequence. Distances, access to each point and the readiness of the person responsible for electrical work matter.
The address locates the building, not a suitable setup position. Photos, height, setback and obstacles are needed; the work sequence is agreed with the site representative.
Describe the job and send a photo of the work area.