Canopy and support placement
Canopy installation calls for support heights, element lengths and access to the connections. Where the frame arrives in sections, the delivery sequence should match the prepared supports.
Near Uchtepa markets and housing, identify an unloading point that leaves the access road clear. Send a site photo and load details. For canopy placement or materials bundles, state the element length and space to orient it. At an operating retail property, arrange to clear goods and vehicles from the assembly zone beforehand.
25 tUchtepa is a south-western district of Tashkent with large residential neighbourhoods.
South-west estates near Farhod — landmark: Farhod Bazaar or the next Uchtepa quarter.

Canopy installation calls for support heights, element lengths and access to the connections. Where the frame arrives in sections, the delivery sequence should match the prepared supports.
For steel bundles, pallets and prefabricated items, state the number of lifts and the weight of one batch. The receiving area needs enough room for the load and subsequent handling on site.
When materials arrive in several deliveries, vehicle sequence and waiting space matter. An unloading plan prevents landed items from occupying the area needed for later lifts.
Send the address, load weight and dimensions, placement height and a photo of crane access.
Message on TelegramProvide a layout, the heaviest assembly weight and distance to the far support. State whether the unit is assembled on the ground and who will secure it once placed.
Deliveries are divided according to actual weight, packaging and site conditions. Batch size is assessed for the job; damaged packaging is not assumed suitable for lifting.
List the loads by vehicle, including item count, heaviest unit weight and landing position. Confirm that a receiving contact is ready and other traffic will not occupy the approach.
Describe the job and send a photo of the work area.