Tashkent Region

25-ton mobile crane in O‘rta Chirchiq District

For warehouse unloading in O‘rta Chirchiq District, agree on the delivery sequence beforehand. A yard sketch showing the gate, landing point and outrigger space helps plan the lift without unnecessary load handling.

Mobile crane on an installation site25 t
01Local landmark

O‘rta Chirchiq District

O‘rta Chirchiq District is a district of Tashkent Region. Include the settlement, mahalla and site coordinates to distinguish the entrance from similarly named or neighbouring addresses.

Area illustration: O‘rta Chirchiq District
O‘rta Chirchiq DistrictArea illustration
0225-ton mobile crane

Jobs at your site

01

Multi-vehicle unloading

When materials arrive in several deliveries, vehicle sequence and waiting space matter. An unloading plan prevents landed items from occupying the area needed for later lifts.

02

Tank or module placement

For a tank, container module or another bulky item, dimensions matter as much as weight. Clarify whether it is empty, the lifting points are approved and the base is ready.

03

Equipment unloading

A machine, plant unit or packaged module should be assessed using manufacturer documentation. In addition to mass, the centre of gravity, approved lifting points and transport orientation matter.

03Before booking

Site preparation

  • Agree on the vehicle order and storage zones before lifting starts.
  • Show the base, fixing points and transport dimensions.
  • Send the load data sheet and a photo of its packaging or transport position.
What to send with your enquiry

Send the address, load weight and dimensions, placement height and a photo of crane access.

Message on Telegram
04O‘rta Chirchiq District

Questions before booking

What is needed for a series of unloadings?

List the loads by vehicle, including item count, heaviest unit weight and landing position. Confirm that a receiving contact is ready and other traffic will not occupy the approach.

Can tank volume be used instead of weight?

No. Volume does not establish actual mass. Provide documentation, fill condition, centre of gravity and the manufacturer’s lifting arrangement.

Is the machine weight enough information?

No. Dimensions, lifting instructions and the receiving position are also needed. An offset centre of gravity and manufacturer limits on tilting are particularly important.

O‘rta Chirchiq District

Book a 25-ton mobile crane in O‘rta Chirchiq District

Describe the job and send a photo of the work area.