Steel-frame installation
Columns, trusses and beams require individual element weights and an erection sequence. A frame drawing helps discuss the crane position and the path from the delivery area to the supports.
For a site in Ohangaron District, identify the settlement and the actual industrial or construction entrance. A lift over a fence requires the structure’s weight, dimensions and distance from the crane position to installation.
25 tOhangaron District is a district of Tashkent Region. Include the settlement, mahalla and site coordinates to distinguish the entrance from similarly named or neighbouring addresses.

Columns, trusses and beams require individual element weights and an erection sequence. A frame drawing helps discuss the crane position and the path from the delivery area to the supports.
For a tank, container module or another bulky item, dimensions matter as much as weight. Clarify whether it is empty, the lifting points are approved and the base is ready.
A machine, plant unit or packaged module should be assessed using manufacturer documentation. In addition to mass, the centre of gravity, approved lifting points and transport orientation matter.
Send the address, load weight and dimensions, placement height and a photo of crane access.
Message on TelegramSuitability depends on truss weight, dimensions, lifting points and working radius. Send the drawing and site photos; a nominal 25-ton rating alone does not establish that a particular lift is possible.
No. Volume does not establish actual mass. Provide documentation, fill condition, centre of gravity and the manufacturer’s lifting arrangement.
No. Dimensions, lifting instructions and the receiving position are also needed. An offset centre of gravity and manufacturer limits on tilting are particularly important.
Describe the job and send a photo of the work area.