Facade access
For joint sealing, local repairs or facade inspection, mark the work area on a full-building photo. Height and horizontal distance from the vehicle are assessed together.
For house maintenance in Qibray District, send an overview showing trees and canopies. If the work is above a garden, show possible parking outside the property and its distance to the required facade section.
45 mQibray District is part of Tashkent Region. For a site around Qibray, include the mahalla and exact vehicle entrance as well as the settlement name so that equipment access can be discussed.

For joint sealing, local repairs or facade inspection, mark the work area on a full-building photo. Height and horizontal distance from the vehicle are assessed together.
Roof-edge access requires eaves height and the proposed parking position. For a point behind a parapet or further onto the roof, mark its setback from the edge and any obstacles.
Work around an entrance needs to account for people below the work point and continued building access. Show canopy width, steps and positions where the vehicle could stand or move.
Send the address, work height and photos of the facade, access route and lift parking space.
Message on TelegramGive the height in metres and mark the point on a photo. Floor count does not show vehicle setback, canopies or other obstacles and cannot establish reach on its own.
That depends on height, edge setback, parapet and vehicle position. A working height of up to 45 m does not imply the same horizontal reach.
Agree on temporary pedestrian access and clearing the vehicle area with the site representative. Then send photos with distances; an empty pavement alone does not confirm a suitable setup position.
Describe the job and send a photo of the work area.