Elevated-area inspection
For building or exterior-equipment inspection, identify what must be viewed from the basket. Points on different sides may require changes in parking position and access sequence.
For a building facade or exterior services, identify the side that needs access. An entrance photo and working height help plan the lift position. If inspection or maintenance covers several building sides, send an access plan and photos of each side. Distinguish viewing points from positions where tools must be used.
45 mMirzo-Ulugbek is an eastern district of Tashkent that hosts scientific institutes and Tashkent State Technical University.
East of the city near universities and institutes — Buyuk Ipak Yuli or Durmon works as a landmark.

For building or exterior-equipment inspection, identify what must be viewed from the basket. Points on different sides may require changes in parking position and access sequence.
For cable routes, ventilation or other facade-mounted services, state the working length. Show crossings with canopies, pipes or wires where they may affect boom movement.
For local facade-panel replacement, show the panel dimensions and fixing position. Suitability depends on access to the joint, vehicle position and permitted platform load.
Send the address, work height and photos of the facade, access route and lift parking space.
Message on TelegramSend an overall view, each working side and possible vehicle positions. A close-up of the defect is useful too, but it does not show the access geometry.
The address locates the building, not a suitable setup position. Photos, height, setback and obstacles are needed; the work sequence is agreed with the site representative.
Not necessarily. Facade length and distances to end points are assessed against boom geometry. Show access along the building so possible repositioning can be discussed.
Describe the job and send a photo of the work area.