Steel-frame installation
Columns, trusses and beams require individual element weights and an erection sequence. A frame drawing helps discuss the crane position and the path from the delivery area to the supports.
At a new Yangihayot construction site, show the entrance and ground at the crane position. Installation planning needs the element weight and lifting height. If the access road is temporary, show its condition and the separate outrigger setup area. For a new frame or canopy, give the erection stage, heaviest assembly weight and readiness to receive the load at height.
25 tThe 12th administrative district of Tashkent, created in 2020 in the south-western part of the city by separating areas from Sergeli and Uchtepa districts; actively being developed with new residential neighbourhoods.
12th district in the south-west (from 2020), new estates — name Sputnik / Birodarlik if that is the address.

Columns, trusses and beams require individual element weights and an erection sequence. A frame drawing helps discuss the crane position and the path from the delivery area to the supports.
For steel bundles, pallets and prefabricated items, state the number of lifts and the weight of one batch. The receiving area needs enough room for the load and subsequent handling on site.
Canopy installation calls for support heights, element lengths and access to the connections. Where the frame arrives in sections, the delivery sequence should match the prepared supports.
Send the address, load weight and dimensions, placement height and a photo of crane access.
Message on TelegramSuitability depends on truss weight, dimensions, lifting points and working radius. Send the drawing and site photos; a nominal 25-ton rating alone does not establish that a particular lift is possible.
Deliveries are divided according to actual weight, packaging and site conditions. Batch size is assessed for the job; damaged packaging is not assumed suitable for lifting.
Provide a layout, the heaviest assembly weight and distance to the far support. State whether the unit is assembled on the ground and who will secure it once placed.
Describe the job and send a photo of the work area.