Construction-material delivery at height
For steel bundles, pallets and prefabricated items, state the number of lifts and the weight of one batch. The receiving area needs enough room for the load and subsequent handling on site.
In Chilanzar quarters, check whether the crane can reach the unloading point. State the quarter number, load dimensions and installation point. For a series of unloadings within a quarter, reserve the storage area after the first lift. Confirm that the materials vehicle’s route and the crane’s departure path will remain clear.
25 tChilanzar is a residential district in south-western Tashkent built up with multi-storey neighbourhoods and served by the Chilanzar metro line.
South-west on the Chilanzar line and C-quarters — write the quarter number or a metro landmark.

For steel bundles, pallets and prefabricated items, state the number of lifts and the weight of one batch. The receiving area needs enough room for the load and subsequent handling on site.
Where entry is restricted, the possible crane position is assessed first. A more distant landing point makes working radius and obstacles along the load path particularly important.
When materials arrive in several deliveries, vehicle sequence and waiting space matter. An unloading plan prevents landed items from occupying the area needed for later lifts.
Send the address, load weight and dimensions, placement height and a photo of crane access.
Message on TelegramDeliveries are divided according to actual weight, packaging and site conditions. Batch size is assessed for the job; damaged packaging is not assumed suitable for lifting.
This depends on radius, fence height, load weight and the outside setup area. Send measurements and an overview; an over-wall lift cannot be promised without these details.
List the loads by vehicle, including item count, heaviest unit weight and landing position. Confirm that a receiving contact is ready and other traffic will not occupy the approach.
Describe the job and send a photo of the work area.