Elevated-area inspection
For building or exterior-equipment inspection, identify what must be viewed from the basket. Points on different sides may require changes in parking position and access sequence.
For roof or external-services inspection in Yuqori Chirchiq District, identify the exact building side. If a greenhouse, fence or trees lie between parking and the work point, show their height and distance from the wall.
45 mYuqori Chirchiq District is a district of Tashkent Region. Include the settlement, mahalla and site coordinates to distinguish the entrance from similarly named or neighbouring addresses.

For building or exterior-equipment inspection, identify what must be viewed from the basket. Points on different sides may require changes in parking position and access sequence.
For cable routes, ventilation or other facade-mounted services, state the working length. Show crossings with canopies, pipes or wires where they may affect boom movement.
Roof-edge access requires eaves height and the proposed parking position. For a point behind a parapet or further onto the roof, mark its setback from the edge and any obstacles.
Send the address, work height and photos of the facade, access route and lift parking space.
Message on TelegramSend an overall view, each working side and possible vehicle positions. A close-up of the defect is useful too, but it does not show the access geometry.
The address locates the building, not a suitable setup position. Photos, height, setback and obstacles are needed; the work sequence is agreed with the site representative.
That depends on height, edge setback, parapet and vehicle position. A working height of up to 45 m does not imply the same horizontal reach.
Describe the job and send a photo of the work area.