Facade access
For joint sealing, local repairs or facade inspection, mark the work area on a full-building photo. Height and horizontal distance from the vehicle are assessed together.
For facade work at a residential building, show the distance from the entrance to the work point. A photo helps discuss lift placement without blocking access. For several facade sections, mark each work height and the distances between points. This helps discuss the work sequence around the building and any need to reposition the platform.
45 mYunusabad is a large residential district in northern Tashkent, served by the Yunusabad metro line.
North of the city on the Yunusabad metro line — name the estate quarter and nearest station in the request.

For joint sealing, local repairs or facade inspection, mark the work area on a full-building photo. Height and horizontal distance from the vehicle are assessed together.
Roof-edge access requires eaves height and the proposed parking position. For a point behind a parapet or further onto the roof, mark its setback from the edge and any obstacles.
For cable routes, ventilation or other facade-mounted services, state the working length. Show crossings with canopies, pipes or wires where they may affect boom movement.
Send the address, work height and photos of the facade, access route and lift parking space.
Message on TelegramGive the height in metres and mark the point on a photo. Floor count does not show vehicle setback, canopies or other obstacles and cannot establish reach on its own.
That depends on height, edge setback, parapet and vehicle position. A working height of up to 45 m does not imply the same horizontal reach.
The address locates the building, not a suitable setup position. Photos, height, setback and obstacles are needed; the work sequence is agreed with the site representative.
Describe the job and send a photo of the work area.