Heavy-unit replacement
Removing an old unit and placing its replacement are separate lifts. Each needs its own weight, lifting points and a clear temporary landing area for the removed component.
For industrial equipment unloading in Angren, establish whether the crane can stand beside the transport vehicle. If installation is tied to a production shutdown, provide the agreed work window and confirm that the installation area is ready.
25 tAngren is a separate city in Tashkent Region. Give the city address and site entrance; for a job outside the city, also specify the district and settlement.

Removing an old unit and placing its replacement are separate lifts. Each needs its own weight, lifting points and a clear temporary landing area for the removed component.
A machine, plant unit or packaged module should be assessed using manufacturer documentation. In addition to mass, the centre of gravity, approved lifting points and transport orientation matter.
When materials arrive in several deliveries, vehicle sequence and waiting space matter. An unloading plan prevents landed items from occupying the area needed for later lifts.
Send the address, load weight and dimensions, placement height and a photo of crane access.
Message on TelegramSend both specifications and a temporary placement plan. A single visit can be discussed after reviewing the site and the readiness of the specialists responsible for disconnection and fastening.
No. Dimensions, lifting instructions and the receiving position are also needed. An offset centre of gravity and manufacturer limits on tilting are particularly important.
List the loads by vehicle, including item count, heaviest unit weight and landing position. Confirm that a receiving contact is ready and other traffic will not occupy the approach.
Describe the job and send a photo of the work area.