Heavy-unit replacement
Removing an old unit and placing its replacement are separate lifts. Each needs its own weight, lifting points and a clear temporary landing area for the removed component.
For Bekobod city, provide the city address to distinguish the site from Bekobod District. For equipment replacement, list the outgoing and incoming units separately because their weights and lifting points may differ.
25 tBekobod is a separate city in Tashkent Region. Give the city address and site entrance; for a job outside the city, also specify the district and settlement.

Removing an old unit and placing its replacement are separate lifts. Each needs its own weight, lifting points and a clear temporary landing area for the removed component.
Columns, trusses and beams require individual element weights and an erection sequence. A frame drawing helps discuss the crane position and the path from the delivery area to the supports.
For a tank, container module or another bulky item, dimensions matter as much as weight. Clarify whether it is empty, the lifting points are approved and the base is ready.
Send the address, load weight and dimensions, placement height and a photo of crane access.
Message on TelegramSend both specifications and a temporary placement plan. A single visit can be discussed after reviewing the site and the readiness of the specialists responsible for disconnection and fastening.
Suitability depends on truss weight, dimensions, lifting points and working radius. Send the drawing and site photos; a nominal 25-ton rating alone does not establish that a particular lift is possible.
No. Volume does not establish actual mass. Provide documentation, fill condition, centre of gravity and the manufacturer’s lifting arrangement.
Describe the job and send a photo of the work area.