Courtyard or over-fence lifting
Where entry is restricted, the possible crane position is assessed first. A more distant landing point makes working radius and obstacles along the load path particularly important.
For unloading in a confined yard in Yangiyo‘l city, show the gate and neighbouring buildings beforehand. If elements must pass over a wall, give the distance to installation and the obstacle height.
25 tYangiyo‘l is a separate city in Tashkent Region. Give the city address and site entrance; for a job outside the city, also specify the district and settlement.

Where entry is restricted, the possible crane position is assessed first. A more distant landing point makes working radius and obstacles along the load path particularly important.
Removing an old unit and placing its replacement are separate lifts. Each needs its own weight, lifting points and a clear temporary landing area for the removed component.
Canopy installation calls for support heights, element lengths and access to the connections. Where the frame arrives in sections, the delivery sequence should match the prepared supports.
Send the address, load weight and dimensions, placement height and a photo of crane access.
Message on TelegramThis depends on radius, fence height, load weight and the outside setup area. Send measurements and an overview; an over-wall lift cannot be promised without these details.
Send both specifications and a temporary placement plan. A single visit can be discussed after reviewing the site and the readiness of the specialists responsible for disconnection and fastening.
Provide a layout, the heaviest assembly weight and distance to the far support. State whether the unit is assembled on the ground and who will secure it once placed.
Describe the job and send a photo of the work area.