Roof edges, eaves and gutters
Roof-edge access requires eaves height and the proposed parking position. For a point behind a parapet or further onto the roof, mark its setback from the edge and any obstacles.
For a guesthouse facade or another site in Bo‘stonliq District, state the working height relative to vehicle parking. Where ground levels change or trees intervene, access to each building side needs advance review.
45 mBo‘stonliq District is part of Tashkent Region. For a site around G‘azalkent, include the mahalla and exact vehicle entrance as well as the settlement name so that equipment access can be discussed.

Roof-edge access requires eaves height and the proposed parking position. For a point behind a parapet or further onto the roof, mark its setback from the edge and any obstacles.
For joint sealing, local repairs or facade inspection, mark the work area on a full-building photo. Height and horizontal distance from the vehicle are assessed together.
For building or exterior-equipment inspection, identify what must be viewed from the basket. Points on different sides may require changes in parking position and access sequence.
Send the address, work height and photos of the facade, access route and lift parking space.
Message on TelegramThat depends on height, edge setback, parapet and vehicle position. A working height of up to 45 m does not imply the same horizontal reach.
Give the height in metres and mark the point on a photo. Floor count does not show vehicle setback, canopies or other obstacles and cannot establish reach on its own.
Send an overall view, each working side and possible vehicle positions. A close-up of the defect is useful too, but it does not show the access geometry.
Describe the job and send a photo of the work area.