Tashkent Region

45-metre aerial platform in Bo‘ka District

For gutter or eaves access in Bo‘ka District, photograph the facade line and roof edge from the side. This helps discuss reaching the work point with the vehicle set back from the building.

Aerial platform truck45 m
01Local landmark

Bo‘ka District

Bo‘ka District is part of Tashkent Region. For a site around Bo‘ka, include the mahalla and exact vehicle entrance as well as the settlement name so that equipment access can be discussed.

Area illustration: Bo‘ka District
Bo‘ka DistrictArea illustration
0245-metre aerial platform

Jobs at your site

01

Roof edges, eaves and gutters

Roof-edge access requires eaves height and the proposed parking position. For a point behind a parapet or further onto the roof, mark its setback from the edge and any obstacles.

02

Workshop or warehouse cladding

For local facade-panel replacement, show the panel dimensions and fixing position. Suitability depends on access to the joint, vehicle position and permitted platform load.

03

Exterior lighting

For luminaire replacement or architectural-lighting access, state the point count, each height and distances between them. These details help discuss equipment moves and access to the supports.

03Before booking

Site preparation

  • Take a side photo showing both the roof and proposed vehicle position.
  • Confirm panel dimensions, tools and the planned working team.
  • Prepare a lighting-point list with heights and positions.
What to send with your enquiry

Send the address, work height and photos of the facade, access route and lift parking space.

Message on Telegram
04Bo‘ka District

Questions before booking

Can the platform reach equipment further onto the roof?

That depends on height, edge setback, parapet and vehicle position. A working height of up to 45 m does not imply the same horizontal reach.

Can the whole workshop be covered from one position?

Not necessarily. Facade length and distances to end points are assessed against boom geometry. Show access along the building so possible repositioning can be discussed.

What if there are several lighting points?

Mark them on a plan or photo sequence. Distances, access to each point and the readiness of the person responsible for electrical work matter.

Bo‘ka District

Book a 45-metre aerial platform in Bo‘ka District

Describe the job and send a photo of the work area.