Roof edges, eaves and gutters
Roof-edge access requires eaves height and the proposed parking position. For a point behind a parapet or further onto the roof, mark its setback from the edge and any obstacles.
For gutter or eaves access in Bo‘ka District, photograph the facade line and roof edge from the side. This helps discuss reaching the work point with the vehicle set back from the building.
45 mBo‘ka District is part of Tashkent Region. For a site around Bo‘ka, include the mahalla and exact vehicle entrance as well as the settlement name so that equipment access can be discussed.

Roof-edge access requires eaves height and the proposed parking position. For a point behind a parapet or further onto the roof, mark its setback from the edge and any obstacles.
For local facade-panel replacement, show the panel dimensions and fixing position. Suitability depends on access to the joint, vehicle position and permitted platform load.
For luminaire replacement or architectural-lighting access, state the point count, each height and distances between them. These details help discuss equipment moves and access to the supports.
Send the address, work height and photos of the facade, access route and lift parking space.
Message on TelegramThat depends on height, edge setback, parapet and vehicle position. A working height of up to 45 m does not imply the same horizontal reach.
Not necessarily. Facade length and distances to end points are assessed against boom geometry. Show access along the building so possible repositioning can be discussed.
Mark them on a plan or photo sequence. Distances, access to each point and the readiness of the person responsible for electrical work matter.
Describe the job and send a photo of the work area.