Courtyard or over-fence lifting
Where entry is restricted, the possible crane position is assessed first. A more distant landing point makes working radius and obstacles along the load path particularly important.
In the compact central area, check access width and turning space. Send an entrance photo, load dimensions and preferred work time. Replacing a heavy unit in a confined yard requires a temporary position for the old component. Mark both landing points so they do not occupy outrigger space or the vehicle route.
25 tYakkasaray is a compact central district of Tashkent with embassies, office buildings and Yakkasaray Bazaar.
Compact centre by Yakkasaray market and the embassy belt — street plus a market landmark is enough.

Where entry is restricted, the possible crane position is assessed first. A more distant landing point makes working radius and obstacles along the load path particularly important.
Removing an old unit and placing its replacement are separate lifts. Each needs its own weight, lifting points and a clear temporary landing area for the removed component.
When materials arrive in several deliveries, vehicle sequence and waiting space matter. An unloading plan prevents landed items from occupying the area needed for later lifts.
Send the address, load weight and dimensions, placement height and a photo of crane access.
Message on TelegramThis depends on radius, fence height, load weight and the outside setup area. Send measurements and an overview; an over-wall lift cannot be promised without these details.
Send both specifications and a temporary placement plan. A single visit can be discussed after reviewing the site and the readiness of the specialists responsible for disconnection and fastening.
List the loads by vehicle, including item count, heaviest unit weight and landing position. Confirm that a receiving contact is ready and other traffic will not occupy the approach.
Describe the job and send a photo of the work area.