Tashkent city

25-ton mobile crane in Mirabad

Near the station and retail sites, identify the unloading area and truck access. Load weight and lifting radius are needed for planning. If unloading depends on a supplier’s arrival, agree on timing and the receiving contact before dispatch. For several packages, provide the heaviest item weight and unloading order.

Mobile crane on an installation site25 t
01Local landmark

Mirabad District

Mirabad is a central district of Tashkent, home to Tashkent's main railway station and several large shopping centres.

Centre by the railway station and malls — landmark: station, Mirabad market or the next estate.

Area illustration: Mirabad District
Mirabad District
0225-ton mobile crane

Jobs at your site

01

Multi-vehicle unloading

When materials arrive in several deliveries, vehicle sequence and waiting space matter. An unloading plan prevents landed items from occupying the area needed for later lifts.

02

Equipment unloading

A machine, plant unit or packaged module should be assessed using manufacturer documentation. In addition to mass, the centre of gravity, approved lifting points and transport orientation matter.

03

Construction-material delivery at height

For steel bundles, pallets and prefabricated items, state the number of lifts and the weight of one batch. The receiving area needs enough room for the load and subsequent handling on site.

03Before booking

Site preparation

  • Agree on the vehicle order and storage zones before lifting starts.
  • Send the load data sheet and a photo of its packaging or transport position.
  • Confirm one-batch weight and whether suitable lifting containers are available.
What to send with your enquiry

Send the address, load weight and dimensions, placement height and a photo of crane access.

Message on Telegram
04Mirabad District

Questions before booking

What is needed for a series of unloadings?

List the loads by vehicle, including item count, heaviest unit weight and landing position. Confirm that a receiving contact is ready and other traffic will not occupy the approach.

Is the machine weight enough information?

No. Dimensions, lifting instructions and the receiving position are also needed. An offset centre of gravity and manufacturer limits on tilting are particularly important.

Can the entire delivery be lifted at once?

Deliveries are divided according to actual weight, packaging and site conditions. Batch size is assessed for the job; damaged packaging is not assumed suitable for lifting.

Mirabad District

Book a 25-ton mobile crane in Mirabad

Describe the job and send a photo of the work area.