Tashkent Region

25-ton mobile crane in Nurafshon city

For installation at a city site in Nurafshon, give the building block, entrance and receiving point. If several contractors share the site, nominate the contact who can confirm base readiness and the element delivery sequence.

Mobile crane on an installation site25 t
01Local landmark

Nurafshon City

Nurafshon is a separate city in Tashkent Region. Give the city address and site entrance; for a job outside the city, also specify the district and settlement.

Area illustration: Nurafshon City
Nurafshon CityArea illustration
0225-ton mobile crane

Jobs at your site

01

Steel-frame installation

Columns, trusses and beams require individual element weights and an erection sequence. A frame drawing helps discuss the crane position and the path from the delivery area to the supports.

02

Canopy and support placement

Canopy installation calls for support heights, element lengths and access to the connections. Where the frame arrives in sections, the delivery sequence should match the prepared supports.

03

Multi-vehicle unloading

When materials arrive in several deliveries, vehicle sequence and waiting space matter. An unloading plan prevents landed items from occupying the area needed for later lifts.

03Before booking

Site preparation

  • Prepare a drawing showing placement points and individual assembly weights.
  • Show whether supports, anchors and a clear assembly zone are ready.
  • Agree on the vehicle order and storage zones before lifting starts.
What to send with your enquiry

Send the address, load weight and dimensions, placement height and a photo of crane access.

Message on Telegram
04Nurafshon City

Questions before booking

Can the crane install roof trusses?

Suitability depends on truss weight, dimensions, lifting points and working radius. Send the drawing and site photos; a nominal 25-ton rating alone does not establish that a particular lift is possible.

What information is needed for a canopy lift?

Provide a layout, the heaviest assembly weight and distance to the far support. State whether the unit is assembled on the ground and who will secure it once placed.

What is needed for a series of unloadings?

List the loads by vehicle, including item count, heaviest unit weight and landing position. Confirm that a receiving contact is ready and other traffic will not occupy the approach.

Nurafshon City

Book a 25-ton mobile crane in Nurafshon city

Describe the job and send a photo of the work area.