Steel-frame installation
Columns, trusses and beams require individual element weights and an erection sequence. A frame drawing helps discuss the crane position and the path from the delivery area to the supports.
For installation at a city site in Nurafshon, give the building block, entrance and receiving point. If several contractors share the site, nominate the contact who can confirm base readiness and the element delivery sequence.
25 tNurafshon is a separate city in Tashkent Region. Give the city address and site entrance; for a job outside the city, also specify the district and settlement.

Columns, trusses and beams require individual element weights and an erection sequence. A frame drawing helps discuss the crane position and the path from the delivery area to the supports.
Canopy installation calls for support heights, element lengths and access to the connections. Where the frame arrives in sections, the delivery sequence should match the prepared supports.
When materials arrive in several deliveries, vehicle sequence and waiting space matter. An unloading plan prevents landed items from occupying the area needed for later lifts.
Send the address, load weight and dimensions, placement height and a photo of crane access.
Message on TelegramSuitability depends on truss weight, dimensions, lifting points and working radius. Send the drawing and site photos; a nominal 25-ton rating alone does not establish that a particular lift is possible.
Provide a layout, the heaviest assembly weight and distance to the far support. State whether the unit is assembled on the ground and who will secure it once placed.
List the loads by vehicle, including item count, heaviest unit weight and landing position. Confirm that a receiving contact is ready and other traffic will not occupy the approach.
Describe the job and send a photo of the work area.