Tashkent city

25-ton mobile crane in Bektemir

At a Bektemir industrial site, arrange access for heavy equipment in advance. Send the load weight and a photo of the unloading point. For tank placement or plant-unit replacement, prepare a layout showing pipes, supports and a temporary landing area for the removed item. Use manufacturer documentation for centre of gravity and approved lifting points.

Mobile crane on an installation site25 t
01Local landmark

Bektemir District

Bektemir is the smallest district of Tashkent by area, located in the south-east of the city and combining industrial and residential use.

South-east, the most compact district — address plus an industrial or housing landmark.

Area illustration: Bektemir District
Bektemir District
0225-ton mobile crane

Jobs at your site

01

Tank or module placement

For a tank, container module or another bulky item, dimensions matter as much as weight. Clarify whether it is empty, the lifting points are approved and the base is ready.

02

Equipment unloading

A machine, plant unit or packaged module should be assessed using manufacturer documentation. In addition to mass, the centre of gravity, approved lifting points and transport orientation matter.

03

Heavy-unit replacement

Removing an old unit and placing its replacement are separate lifts. Each needs its own weight, lifting points and a clear temporary landing area for the removed component.

03Before booking

Site preparation

  • Show the base, fixing points and transport dimensions.
  • Send the load data sheet and a photo of its packaging or transport position.
  • Prepare separate specifications for the outgoing and incoming units.
What to send with your enquiry

Send the address, load weight and dimensions, placement height and a photo of crane access.

Message on Telegram
04Bektemir District

Questions before booking

Can tank volume be used instead of weight?

No. Volume does not establish actual mass. Provide documentation, fill condition, centre of gravity and the manufacturer’s lifting arrangement.

Is the machine weight enough information?

No. Dimensions, lifting instructions and the receiving position are also needed. An offset centre of gravity and manufacturer limits on tilting are particularly important.

Can replacement be arranged in one visit?

Send both specifications and a temporary placement plan. A single visit can be discussed after reviewing the site and the readiness of the specialists responsible for disconnection and fastening.

Bektemir District

Book a 25-ton mobile crane in Bektemir

Describe the job and send a photo of the work area.